Library Refurbishment Project – Completed 2020
Working with Kingerlee Ltd, we carried out the installation of new distribution, power, access control, fire alarm and lighting including emergency, within the Department of Oriental Institute library,the refurbished works were located in the reception, research room and offices.
We used suspended luminaires supplied by Zumtobel lighting, complete with Hostwave Emergency lights, all controlled via a sensor control system from Ex-Or.
The architectural nature of the library meant we installed power coated containment to blend into its environment. The Distribution system was upgraded with new Distribution boards being installed complete with Rayleigh meters and Dehn Surge protection units.
New power installation was installed for the new layout complete with additional fire detection devices commissioned by Pyrotec services.
Salto door access equipment was installed and commissioned by Chris Lewis Security.
Now the library has been transformed into the ideal space for all users! A reception area, divided away from the reading areas and glass walls creating an open plan feel but also providing quiet reading areas.