We were appointed by University College Oxford to carry out electrical installation condition reports, also called periodic testing.
The University’s works department has a really good schedule which lays out exactly when their buildings are to be tested, and we work closely with them to carry out the tests.
Like all Colleges around the University the emphasis is on the students, so we have to co-ordinate our work so it doesn’t affect their studies. This means we have to be completely flexible as well as sensitive to the areas we need to test and the needs of University personnel.