Main corridors – Lighting Refurbishment Project – Completed 2018
We were delighted to design and install a new LED Lighting system with automated controls to the main corridors in the prestigious Sherrington building.
The contemporary suspended luminaires in the corridors were supplied by Zumtobel lighting, controlled via a smart lighting control system supplied by Ex-or. And we also installed Zumtobel Online Resclite luminaires to provide highly effective emergency lighting to every corridor. As a result the overall look is much cleaner and brighter, as well as being a great deal more energy efficient.