Christ Church – Kitchen Works

PROJECT DESCRIPTION

Installing new Mains Infrastructure – Completed 2017

We were appointed by Christ Church to supply and install a new submain and distribution system to the kitchen’s existing electric system.

The kitchen range was due for an upgrade from gas to electric, which was going to affect the power consumption of the electrical system thanks to an insufficient existing supply. The work therefore involved installing 2no 240mm2 4core LSFSWA cables from the South Substation, through the grounds of Christ Church via excavations and through the fabric of the building, all the way to the Chef’s office.

The new cable was terminated into a new Panel board, upgrading the whole of the distribution. To avoid disrupting the kitchen, we carried the work out one circuit at a time to ensure the room always had power. We also installed new submain circuit cables to various pieces of equipment.