Testing electrical installations – Completed 2018
We were appointed by Christ Church to carry out electrical installation condition reports, essential periodic testing. The work involved close liaison with the Clerk-of-the-works department to programme and arrange varous areas for sequencing.
The building’s sheer size means testing takes just over a year to complete, and we have to work closely alongside every department at Christ Church to ensure there’s minimal disruption.
The kitchen is particularly busy, as is the catering department, and the testing work was about as tight and complex as it gets. We only had a three hour daily slot in which to do the tests, but our lead test engineer programmed in all the works with the C.O.W and Head Chef to a satisfactory level.