Acting as the main contractor on this phase of works, we have started on site having issued our Construction Phase Plan.
Site setup consisting of protection to Cathedral artifacts, welfare facilities including hand sanitising stations and access equipment(scaffolding) has been carried out and works are underway.
We’re currently installing both FP200 and MICC (fire resistant) cable along the clerestory cable containment system, between the new LED light fittings final location’s in the Latin Chapel, North Aisle, Lady Chapel, South Transept, Central Tower and the power and control devices that are to be installed in a serviceable location.
Final designs of the Mike Stoane luminaires have been submitted for approval to put into manufacture.
Principal Designer – Purcell
CDM Consultant – Andrew Alder Associates Ltd
Lighting Design – Sutton Vane Associates
Electrical Consultant – CBG